KMKhaled MhamdiSenior Process Engineer
/
Contact
03 / ENERWISE

Refining performance.
Simulated in ENERWISE.

Python · Streamlit · Plotly · Pandas

ENERWISE logo
ENERWISEEnergy Optimization &
Carbon Management

My Python platform connects refinery energy performance, carbon accounting, optimization projects and heat integration.

Request an ENERWISE demo
SIMULATED REFINING CASE
$4.25M/ yearenergy optimization potential
26,399tCO₂ / yearenergy-linked CO₂ saving target
520.379kgCO₂e / t crudecarbon dashboard intensity
925,733tCO₂e / yeardraft inventory · Scopes 1–3
≈$930/ hourpreheat-train retrofit TAC
01

Energy & carbon dashboards

ENERWISE / Energy dashboard

Refinery energy dashboard

Energy use, costs, targets and EII; $4.25M/year optimization potential and 26,399 tCO₂/year saving target.

ENERWISE / Carbon dashboard

Refinery carbon dashboard

Scope 1–3 emissions, reduction opportunities and carbon intensity: 520.379 kgCO₂e per tonne of crude in this view.

02

Optimization projects & carbon inventory

ENERWISE / Energy optimization

From energy opportunities to projects

Operational actions and investment projects: boiler and fired-heater excess air, turbine condenser pressure, variable-speed drives and heat recovery.

ENERWISE / Carbon optimization

Carbon reduction actions & projects

Individual reduction estimates for operating improvements, heat recovery, variable-speed drives and amine CO₂ capture.

ENERWISE / GHG inventory

Traceable Scope 1–3 carbon inventory

Draft inventory: 925,733 tCO₂e/year, with activity data, emission factors, sources and scope-by-scope detail.

03

Pinch analysis & preheat-train retrofit

ENERWISE / Heat integration

Preheat-train heat integration retrofit

Solution 2: hot/cold streams, exchanger shells and residual utilities. Total annualized cost (TAC): $930.66/h, approximately $930/h.

ENERWISE / Pinch analysis

Composite curves & pinch targets

Composite and shifted composite curves for the retrofit case, with ΔTmin = 20°C and the thermodynamic pinch identified.

Simulated case · Optimization potential and selected retrofit results · Each screenshot retains its displayed calculation state.

Contact

A process challenge, a project
or an engineering opportunity?